Lahad Datu power plant: Decision on fuel in Jan The Borneo Post Using the gas to be extracted from Sabah Oil and Gas Terminal (SOGT) in Sipitang as an alternative has been floated since the beginning but concern on the huge additional cost in sending the fuel to the east coast kept the idea from being materialized. |
Sumber: Sipitang Feed
0 comments:
Post a Comment